Back to the project

Loma Campana · Añelo · Neuquén — RP 17 and By Pass

The operational heart of the basin

Where the hub sits, what surrounds it, and why that location is the project's core asset.

1,000 m
To the new roundabout

RP 17 × By Pass

7 km
To Añelo

The basin's service town

< 3 km
Aerodrome and railway

Loma Campana · Norpatagónico

< 15 km
To the key blocks

≈50% of production

850 m
Of frontage on RP 17

Potential: +2 km

+1,000 ha
TBSA Energy District

The macro-project framing the hub

In oilfield logistics, distance to the wellsite is not a convenience: it is the business. A supplier's competitive edge is measured by the ability to supply the field in hours rather than days, and that is determined by where its base sits.

Loma Campana is the engine of Vaca Muerta. The site has direct frontage on Provincial Route 17 and is less than 1,000 metres from the new By Pass roundabout, the axis reshaping traffic across the whole basin, with direct access to Neuquén and Rincón de los Sauces.

Directly opposite are YPF's Unconventional Regional Management office and its Crude Treatment Plant. Around them, the bases of YPF Directo, AESA and YPF's Sand Plant. It is an environment with continuous vehicle flow, every day of the year.

The map, point by point

Location on satellite imagery: RP 17, the new By Pass and YPF operations at Loma Campana

The site is outlined in yellow. The labels on the image are the ones detailed below.

Open in Google Maps

What is around

  • YPF Unconventional Regional Management

    Opposite the site

    Operations

    The decision centre for YPF's unconventional operation, on the same RP 17 alignment.

  • Loma Campana Crude Treatment Plant

    Opposite the site

    Operations

    YPF facility for treating the area's crude.

  • YPF Directo and AESA bases

    Operations

    Yards and operating bases that sustain the area's daily movement.

  • YPF Sand Plant

    Operations

    Frac sand supply, one of the basin's most intense logistics flows.

  • RP 17 × new By Pass roundabout

    1,000 m

    Access

    The basin's new circulation axis, with direct access to Neuquén and Rincón de los Sauces.

  • Future service station and Truck Center

    1,000 m

    Services

    On the RP 17 and By Pass roundabout. Earthworks have already begun.

  • Loma Campana aerodrome

    < 3 km

    Access

    Air connection for the movement of technical and management staff.

  • Head of the Norpatagónico railway

    < 3 km

    Access

    Railhead for bringing heavy freight into the basin.

  • Añelo

    7 km

    Urban centre

    The basin's service town, with its workforce, retail and suppliers. The site is not within its urban boundary: it sits in Loma Campana, and that difference is what simplifies conveyancing.

The blocks it serves

Within a radius of less than 50 km, the hub serves the blocks that today concentrate close to 50% of Vaca Muerta's production. The most active ones are less than 15 km away.

  • Loma Campana
  • Angostura Sur
  • La Amarga Chica
  • Bandurria Sur
  • Bajada del Palo Oeste

Access and connectivity

  • 850 metres of frontage on the paved Provincial Route 17, with the potential to exceed 2 km on the same alignment as the hub grows.
  • 1,000 metres from the new By Pass roundabout, which reorganises heavy traffic across the basin and avoids passing through Añelo.
  • Direct access to Neuquén city and to Rincón de los Sauces along the same corridor.
  • Aerodrome and railhead less than 3 km away, for staff and for freight that does not come by truck.

The TBSA Energy District

The hub sits inside the TBSA Energy District, a macro-project of more than 1,000 hectares driven by the trust that owns the land.

That institutional framework does two things: it leverages the hub's growth, because the district concentrates the operations that generate the demand; and it reinforces title security, because the land is transferred directly from the owner and developer trust.

This is the site's competitive edge: Añelo falls under its own municipal authority, and what lies outside the urban boundary is Loma Campana. Being on the outside, conveyancing follows a provincial administrative scheme that simplifies the transfer of title.

On-site services and infrastructure

48 m

Central avenue

Dual 15 m carriageways, tree-lined boulevard and pavements. Sized for heavy equipment turning.

2 × 15 m

Cross streets

They front the lots and organise circulation inside the park.

50 + 30

Parking

50 spaces for light vehicles and 30 truck bays, at the entrance.

Water available

Already on site. The rest of the utilities infrastructure is rolled out progressively according to user requirements.

Perimeter and access

Defined perimeter. Gatehouse, access control and entrance identity in design.

Reserved common areas

The master plan reserves land for common infrastructure and for shared schemes between users that create economies of scale.

The two parcels

Survey on satellite imagery: two parcels integrated into a single master plan

The site totals 20.79 hectares: two parcels integrated into a single master plan.

Request the investment deck

Phase 1 is sold by order of reservation. Request the list of available lots, the survey plan and the current terms proposal.

Contact

Leave your details and we will get in touch

We will send you the full brief, the survey plan and the list of available lots with current terms.